tomdarren2449 tomdarren2449
  • 11-06-2021
  • Business
contestada

What is the total cost to move products between work centers A and D, and between work centers B and C combined

Respuesta :

Munali Munali
  • 14-06-2021

Answer:

More than $0 but less than or equal to $100.

Explanation:

The transportation cost is $2.

Load summary is AB = 12, AC = 25, AD = 12, BC = -19, BD = 21, CD = 34.

The total cost to move product between A and D and B and C combined is ;

A and D = 12 * $2 = $24

B and C = 19 * $2 = $38.

Answer Link

Otras preguntas

how can i identify a covalent or ionic bond
whatssssssssss uppppppppppppppp
a. Describe the grandfather as seen in theportrait.​
The capital of the kingdom of Babylonia and of two Babylonian empires was A) Mesopotamia B) Egypt C) Babylon
The Pauli Exclusion Principle tells us that no two electrons in an atom can have the same four quantum numbers. Enter ONE possible value for each quantum number
Need help this is the last one lol :)
A man is picked up by a tornado and dropped a quarter mile away from his home. Even though authorities estimate that his body was dropped at 30 mph he suffered
someone answer 6 and 7 thank you
why do doctor inject the sick with small amounts of dead viruses?
what is the answer to 45,214 to the nearest thousands